Portfolio

Selected engagements

Representative work across information management strategy, BEP production, EIR advisory, and programme-level digital delivery in infrastructure, aviation, and public-sector environments.

Metrics are reported using a consistent structure (Time, Risk Avoided, Outcome) and aligned with common sector benchmarks on information risk and interoperability (including NIST GCR 04-867).

Programme Delivery

Digital Delivery Framework for National Infrastructure Programme

Client: National infrastructure owner · UK

Challenge

A £9bn national infrastructure programme with dozens of supply chain partners needed a unified information management framework. Each contractor was following different standards, naming conventions, and BEP formats. The client had no visibility into what was being delivered, when, or to what quality.

Approach

Designed and implemented the programme’s IM framework from scratch.

  • ISO 19650 requirements, BEP standards, and CDE governance
  • Supply chain capability assessment, TIDP/MIDP management, and compliance reporting
  • Delivery team onboarding across a 14-project transmission portfolio over 6 months
40+
Outcome — supply chain partners onboarded
14
Risk avoided — projects under a unified standard
6 mo
Time — framework to portfolio adoption

The framework transformed how we manage information across the programme. For the first time, we have genuine visibility into what the supply chain is delivering.

— Programme Director, National Infrastructure Owner
BEP Production

BEP Production for Tier 1 Contractor Bid

Client: Tier 1 contractor · Competitive bid

Challenge

A Tier 1 contractor needed a compliant pre-appointment BEP for a major public-sector bid. The EIR was 45 pages, the deadline was 7 days away, and the internal team had started from a blank template with no structured approach to capturing the EIR requirements.

Approach

Used Capsar.io to structure the response from the EIR through to final submission.

  • Parsed the EIR and extracted structured requirements
  • Drafted a full 14-section BEP with a Responsiveness Matrix
  • Produced PDF and editable DOCX deliverables within 5 days
5 days
Time — EIR to final BEP package
100%
Risk avoided — EIR requirements traceable in matrix
1/1
Outcome — bid won

We went from a blank page to a submission-ready BEP in under a week. The responsiveness matrix alone was worth the engagement — we could see exactly where our gaps were.

— Bid Manager, Tier 1 Contractor
Information Requirements

EIR Review & Supply Chain Readiness

Client: Public-sector asset owner · Framework programme

Challenge

A public-sector client had drafted an EIR for a multi-year framework programme, but the supply chain was struggling to respond. BEPs coming back were inconsistent, incomplete, and didn’t address key requirements. The client suspected the problem started with the EIR itself.

Approach

Conducted a detailed quality review of the EIR against ISO 19650 and OIR alignment.

  • Identified ambiguous requirements and missing acceptance criteria
  • Produced a revised EIR and supply chain readiness brief
  • Ran a contractor workshop to align expectations before delivery
3 wks
Time — EIR review to revised issue
30+
Risk avoided — ambiguous requirements removed
85%
Outcome — improvement in BEP quality

The revised EIR transformed the quality of BEPs we received. For the first time, our supply chain actually understood what we needed — and delivered it. The workshop alone saved months of back-and-forth.

— Digital Lead, Public Sector Asset Owner
IM Strategy

CDE Governance & Reporting for Regional Contractor

Client: Regional contractor · Multi-project portfolio

Challenge

A regional contractor running 15+ concurrent projects had a CDE that was essentially used as a file dump. No naming conventions, no workflow states, no reporting, no governance. Project teams were managing documents by email. The CDE licence was expensive and underutilised.

Approach

Designed a practical CDE governance framework and embedded it into day-to-day delivery.

  • Naming conventions, metadata standards, workflow states, and access control
  • Configured the CDE platform and reporting dashboards to enforce the framework
  • Trained teams, created quick-reference guides, and ran 4-week adoption sprints
4 wks
Time — first governance adoption sprint
60%
Risk avoided — reduction in document queries
90%
Outcome — CDE adoption rate

We finally have a CDE that works the way it was supposed to. The reporting alone has changed how leadership views project information.

— Operations Director, Regional Contractor